2017年11月28日 星期二

All models support 12x GbE ports and 4 pairs of advanced LAN bypass function that allows for uninterrupted operation of a serial network












With over 30 years’ experience in Industrial Computer and Networking Appliancedevelopment, Acrosser Technology will substantially increase further its efforts in expanding its networking appliance lines in 2018. Acrosser networking appliance lines include micro boxes and 1U rack mounts in 2017, and will soon add 2U rack mounts in 2018, and integrated hardware, software and firmware together to fulfill customers’ needs in UTMSD-WANSDNNFV and v/uCPE and others.

In its micro box product line, Acrosser offers compact throughput and unparalleled high-performance telecommunication experience. The optimized system design allows network systems to function in a small footprint and form factor. In this particular segment, theAND-J190/J180N2-C612, equipped with Intel® Celeron® Bay Trail J1900/ J1800; delivers exceptional high performance. On the other hand, the AND-G420N1, equipped with AMD® G-Series GX-420MC, 4-core@2.0GHz, 2MB L2; is a great alternative for the budget-conscious buyers. These cost-effective network security appliances, offer stable performance with low power consumption; and are suitable in multiple security applications including:network intrusion preventioncontent filteringdata leak prevention, VPN and unified threat management (UTM).  

In its 1U rack mount product line, Acrosser again offers its customers high-performance telecommunication experiences across the board. The standard 1U rack mount form factoris the network appliance that allows multiple network security applications to work under the X86 architecture. In this segment, ANR-C236N1 series is the mainstream 1U-rackmount platform, equipped with Intel 7th Generation Kabylake-S Xeon E3 v6 /Core i7 /i5 /i3 CPU. All models support 12x GbE ports and 4 pairs of advanced LAN bypass function that allows for uninterrupted operation of a serial network, and prevents node failure on the network in the case of power failure. In addition, the ANR-J190/J180N2-C612, equipped with Intel® Celeron® Bay Trail J1900/J1800, are the entry-level network appliances offering cost-effective high-performance solutions in 1U-rackmount form factor.  

For 2018, Acrosser Technology will further invest its valuable resources in developing even wider range of network appliances, including more technologically advanced rackmounts and micro boxes. Acrosser will integrate hardware, software and firmware together to fulfill customers’ needs in UTM (Unified Threat Management), SD-WANSDN (Software Defined Network), NFV (Network Function Virtualization), v/uCPE (Virtualized /Universal Customer Premise Equipment) and others. 

Should you have any OEM/ODM project requiring network appliances, please feel free to contact us. Acrosser, is 100% committed to providing its OEM/ ODM/ JDM and end-user clientele with high-quality innovative embedded computer solutions and networking appliances for shorter time-to-market and in achieving higher competence to win business opportunities in the market place.


For pricing and availability, please send your inquiry at:http://www.acrosser.com/inquiry.php

Subscribe to our social media sites and stay connected!
Please visit us @ the following social media sites: 


Acrosser Facebook
Acrosser TwitterAcrosser Google+
Acrosser Youtube
Acrosser Linkedin


2017年11月22日 星期三

Acrosser AIV-QM97V1FL fanless In-Vehicle system, is equipped with Intel Core i3/i5/i7 Broadwell CPU

With the continued increasing needs of Telematics and intelligent traffic system(ITS), the demands of new in-vehicle technology had been increasing as well.
With the end of establishing Intelligent Transportation Systems (ITS) nationwide, the United States Department of Transportation is planning to regulate all new cars to be equipped with V2V (Vehicle to vehicle communications, a technology which allows vehicles to communicate or talk to each others, as an advanced high-tech alternative to avoiding collisions. The Advanced Driver Assistance Systems (ADAS), are systems developed to automate,adapt and enhance vehicle systems for safety and better driving after 2017.

Meanwhile, Wireless Access in Vehiclualr Environments(WAVE) and Dedicated Short-Range Communications(DSRC) technologies are becoming major core technologies of Intelligent Transportation Systems (ITS). Vehicles are able to connect to other vehicles via in-car pc or roadside stations in order to process V2V(Vehicle-to Vehicle) or V2I(Vehicle-to-Infrastructure) through 5.9GHz band. With these new technologies, drivers can avoid unexpected collisions, keep safety distance automatically, and receive updated traffic information at any given time.
Acrosser, a leading manufacturer of industrial PC, had committed its valuable resource for furture develop its advanced in-vehicle product lines, such as the AIV-QM97V1FL and the AIV-HM76V1FL. Acrosser in-vehicle PCs are among the best appliances in the market available today in helping build traffic management and control systems, transport telematics and intelligent traffic system.

Acrosser AIV-QM97V1FL fanless In-Vehicle system, is equipped with Intel Core i3/i5/i7 Broadwell CPU, the Acrosser smart power system, and available GPS/ 4G LTE/ WiFi/ Bluetooth/ M.2 SSD optional modules.On the other hand, the AIV-HM76V1FL fanless In-Vehicle system, is equipped with Intel Core i3/i7 + HM76 with Acrosser s smart power system,  and also available GPS/3.5G/WiFi/Bluetooth optional modules.






Acrosser Dictionary
WAVE: Wireless Access in Vehicular Environments
DSRC: Dedicated Short-Range Communications
V2V: Vehicle to Vehicle
V2I: Vehicle to Infrastructure

For more product information and the cost of products? Please receive a product quote RIGHT NOW! http://www.acrosser.com/inquiry.html

Product Information:
In-Vehicle PC: http://www.acrosser.com/Products/In-Vehicle-Computer.html


Subscribe to our social media sites and stay connected!

Please visit us @ social media:



2017年11月17日 星期五

Acrosser Technology not only provides products with high reliability and availability




There are three major types of In-Vehicle Gateway in the Telematics industrial supply chain: OBDII Dongle, Embedded Transportation Terminal and Rugged Tablet. Acrosser is focused on the Embedded Transportation Terminal, or also known as the In-Vehicle PC segment, which provides Embedded Transportation Terminal with rugged design, higher flexibility and wider operation temperature range. All products meet E-Mark and other certifications.











Nowadays,Fleet Management is a popular and well-adapted solution in Telematics applications, of which AcrosserIn-Vehicle PCs play a key element in the segment. For example: in the tracking application of Fleet Management for truck or bus, Acrosser In-Vehicle PCs can execute route planning to save on fuel costs and time, as well as track vehicle location to monitor driver and vehicle safety by adding a surveillance video system. For management application of Fleet Management, Acrosser In-vehicle PCs can be used in implementing driver coaching and instant communication to keep off danger and/or avoid unexpected accidents. Moreover, Acrosser In-Vehicle PCs can be utilized for preventive maintenance to help improve fuel economy and costs.

Acrosser In-Vehicle PCs are designed with many essential key features such as wider operating temperature, anti-shock and vibration, fan-less system for higher MTBF, rugged body and higher flexibility. With its powerful performance, the Acrosser In-Vehicle PC AIV-QM97V1FL can be used in Fleet Management from tracking to management applications. As an example, the AIV-QM97V1FL can be installed in trucks to add telematics and provide advanced driver management, which help prevent danger and take proactive measures in improving fuel economy and costs.
Acrosser In-Vehicle PCs also can be also installed in ambulances to improve efficiency of the route planning, and to provide better communication between the ambulance and the hospital via 4G LTE/Wi-Fi in implementing Telemedicine.

Acrosser In-Vehicle PCs are primarily designed to meet and fulfill every need from customers in accomplishing the desired results of Telematics. Acrosser had developed a full range of product line of In-Vehicle PCs which include the AIV-QM97 seriesAIV-HM76 seriesAR-V6100 series, AR-V6005 series and AR-V6002 series. Each and every product is built with remarkable quality and designed to successfully survive rugged environments. Acrosser Technology not only provides products with high reliability and availability, but also In-Vehicle Computers with the best scalability and manageability in the industry. Acrosser Technology is your best choice for buildingTelematics applications in today’s IoT environment.

For more product information and availability, please send your inquiry at:http://www.acrosser.com/inquiry.php

Subscribe to our social media sites and stay connected!
Please visit us @ the following social media sites:
 
 




2017年11月9日 星期四

The ANR-C236N1 is equipped with a hot-swappable HDD/SSD for RAID 0/1 which allows your IT staff to remove the malfunctioning HDD











April 11, 2017, Taipei– Acrosser Technology Co., Ltd. (Acrosser) proudly announces its first new product in 2017, the ANR-C236N1, a powerful 1U rackmount server with unique Dual-Protection feature which allows simultaneously supporting both hot swappable HDD/SSD and the highly-effective redundant power supply. This Dual-Protection can eliminate unnecessary failures, reduce the chance of system errors, and improve server efficiency, as well as the IT staff efficiency.

Whether it is the web server, mail server, UTM or any other network application platform, stability and reliability are absolutely the first 2 priority considerations for buyers. Even for a short period, mechanical failure will cause great loss in business.

To meet these needs, the new and powerful Acrosser ANR-C236N1 series server comes with its unique Dual-Protection feature which protects your server/network to run safety 24/7. The ANR-C236N1 is equipped with a hot-swappable HDD/SSD for RAID 0/1 which allows your IT staff to remove the malfunctioning HDD/SDD without shutting down the machine, thereby eliminating machine downtime. The other feature of Dual-Protection is the ANR-C236 is also equipped with 1+1 redundant power supply units (RPSU) which avoids the unexpected power failure and increase the power supply product life by balancing the power output.


In addition to the Acrosser unique Dual-Protection, this brand new rackmount server comes with the latest Intel® server chipset C236 PCH, which supports the latest Intel® Xeon® E3-1200 V5 server processor, and the 6th generation CPU Skylake-S Core i7/i5/i3/Pentium series. Moreover, the ANR-C236N1 designed for Skylake-S is forward compatible with Intel® 7th generation CPUKabylake
In addition, the ANR-C236N1 series provides a more flexible server platform & system expansion versatility with 12x GbE copper LANs (4-pair bypass), 2x 10G fiber networks (SFP+) , 1 x expandable network interface modules (Exp. NIM), 1 Console, 2x USB 3.0, 2 x USB 2.0, 1x HDMI and 1 x Exp. PCIe slot. Furthermore, ANR-C236N1 series is equipped with an LCM display which shows 100 x 16 Pixels in Graphic Mode and 16-character x 2-line in Character Mode. In the power system, a set of 1+1 redundant power supply units (RPSU) come with AC-IN (100~ 240V) , enabling reliable options for system recovery. The ANR-C236N1 power system comes with a special Smart Fan System which increases or decreases fan speed to develop efficient and cost-effective power systems.



Acrosser had committed its valuable resources to further develop its advanced network product lines. Because of these efforts, the ANR-C236N1 had developed as a perfect service/network machine for most business networking applications. Acrosser Technology not only provides products with high reliability and availability, but also networking appliances and products with the best scalability and manageability in the industry. Acrosser Technology is your best choice for building servers and workstations in today’s workplace.


For more information about this ANR-C236N1 1U rackmount server, please check our youtube channel:
https://www.youtube.com/watch?v=aXvC7PIeoOs

For more product information, or asking the price of this brand new product,  please receive a product quote RIGHT NOW!
http://www.acrosser.com/inquiry.html

Acrosser, is 100% committed to providing its OEM/ ODM/ JDM and end-user clientele with high-quality innovative embedded computer solutions and networking appliances for shorter time-to-market and in achieving higher competence to win business opportunities in the market place.

Subscribe to our social media sites and stay connected!
Please visit us @ the following social media:



Acrosser Twitter
Acrosser Facebook
Acrosser Linkedin
Acrosser Google+
Acrosser Youtube




2017年11月1日 星期三

Fleet managements from tracking application to management application













November 02, 2017, Taipei– Acrosser Technology Co., Ltd. (Acrosser) proudly announces its latest in-vehicle product, the brand new AIV-APL1V1FL, the new Intel Pentium-N4200 fan less in-vehicle computer which is perfect for all kinds of telematics solutions.


The most important part of telematics is communication technology, in AIV-APL1V1FL, this powerful in-vehicle computer equipped with Intel Apollo lake SoC chipset and supported up to 8GB DDR3L 1866 MHz SO-DIMM memory. AIV-APL1V1FL had built-in various communication technologies such as WiFi, Bluetooth, CAN-Bus, and 3G/4G, can provide powerful communication ability to different scenarios. Moreover, AIV-APL1V1FL also equipped 2 x swappable 2.5”HDD bay which can provide massive data saving and processing during communication.














Besides, AIV-APL1V1FL, designed with rich I/O for reading sensor data and control device to build intelligent telematics PC systems. Its rich I/O including 1 x VGA port (DB15) ,1 x DVI ,3 x Mini PCI-e,2 x GbE RJ45,1 x RS-232/422/485,3 x RS-232,4 X USB 3.0,8-bit GPIO (4 In, 4 Out),1 x MIC in,1 x Audio out, 4 antenna holes(1 x SMA for GPS, 1 x SMA for 4G,2 x SMA for Wi-Fi & Bluetooth),SIM Slot x 2,DB9 connector(support CAN 2.0A/2.0B protocol) and On-board TPM 1.2 / 2.0(Optional). Within these rich I/O, AIV-APL1V1FL can meet different needs from various purposes.













To sum up, AIV-APL1V1FL designed with many important keys features such as wider operation temperature, anti-vibration; fan-less, rugged body and higher flexibility. Within powerful performance, AIV-APL1V1FL can be used on following scenarios:






1. Fleet managements from tracking application to management application.
2. Installed on trucks to adding telematics to provide advanced driver management to prevent dangers and to take proactive measures to improve fuel economy and costs.
3. Installed on public transit to adding video surveillance system for driver coaching, vehicle performance tracking and safety monitoring.
4. Installed on ambulance to improve route planning, telemedicine service and avoid unexpected danger.


Acrosser Technology, a global pioneer in the evolution of industrial computing, had committed its valuable resources to further develop its in-vehicle computer product lines. Because of these efforts, the AIV-APL1V1FL had developed as a perfect machine for most telematics applications. Acrosser Technology not only provides products with high reliability and availability, but also in-vehicle computers with the best scalability and manageability in the industry. Acrosser Technology is your best choice for building telematics applications in today’s IoT environment.



AIV-APL1V1FL Features
Rugged fan-less design Support New Intel Pentium N4200 processors 1 x DDR3L 1866 MHz SO-DIMM, up to 8GB Support CAN 2.0A/2.0B or OBDII+ J1939 protocol(Optional) VGA & DVI video output Support 4 Channel analog Capture card 2 x swappable 2.5 HDD bay TPM 1.2 / 2.0 Variety Wireless Communication


 


Acrosser, is 100% committed to providing its OEM/ ODM/ JDM and end-user clientele with high-quality innovative embedded computer solutions and networking appliances for shorter time-to-market and in achieving higher competence to win business opportunities in the market place


For pricing and availability, please send your inquiry at: http://www.acrosser.com/inquiry.php


Subscribe to our social media sites and stay connected!
Please visit us @ the following social media sites: